Natural Gas and Oxygen Skid
Three-header natural and oxygen valve train skid assembly
The customer supplied valves, components, control panel and drawings with the frame fabricated and piping runs cut and welded by us to the drawings. The unit was wired to supplied control panel and the customer visited our facility to check the control panel and for leak testing. The skid required non-destructive weld testing. An outside contractor was hired by the customer to perform dye-penetrant and x-ray weld testing. All welds passed testing and the skid shipped without issue.
|
|
|
 |
|
|
|
|
|
|
|
 |
|
|
|